representative peter king and steve israel are requesting the army corps of engineers and the energy department take over repairs from the long island power authority. known as lipa whose work they have called abysmal. more than 15,000 people don't have power. what's worse is the lack of answers. >> some of us who actually get power, once that grid is turned on and our power is turned on we still don't have power because most of our electrical boxes are under water. need to get electricians and power lines put in because it was under water. it's time we need the power on so we can get our lives rebuilt. >>lipa hope to have 9 a% of the power restored by tuesday. but about 65,000 customers have such severe flood damage it will take extensive repairs before they can begin restoring power. new questions this morning about whether four americans could have been saved from the terror attack in benghazi. according to the pentagon's newly released time line. a special op.s team in croatia was told to prepare to deploy 2 to 4 hours after the attack started. the team did not arrive at a base i